What Happens When You Say \”Actually, I’d Like It This Way\” Mid-Project | How Spec Changes and Additional Costs Work

What Happens When You Say "Actually, I'd Like It This Way" Mid-Project | How Spec Changes and Additional Costs Work

As a website build moves forward, there will always be things you notice only after seeing the actual screens. “I want a photo here too.” “We didn’t need this item after all.” “Actually, I’d like to add another contact form.”

This in itself is not a bad thing. In fact, it is part of how a good site comes together. The problem is that if you haven’t decided how to handle these changes, it turns into a “you said / I never said” situation, and you end up in a dispute over cost and deadlines at the very end.

This article explains what counts as a spec change, how additional costs are determined, and how to communicate changes without disputes, including the web production side’s perspective.

The Short Answer

It is neither “every change costs extra” nor “anything is handled for free.” The dividing line is whether it’s an adjustment within the agreed scope or something that goes beyond it. If it’s within scope, it’s handled within your allotted number of revisions; if it goes beyond, an additional quote is needed. The most important thing is to tell us as soon as you think you want a change. The further along the process, the more work the same change requires.


Contents

“Revisions” and “Spec Changes” Are Different Things

Even when both sound like “please fix this,” from the production side there are two types.

What it isCost
RevisionWork to bring the result closer to what was agreedIncluded in the quote (with a limit on the number of rounds)
Spec changeChanging what was agreed itselfRequires an additional quote

Let’s look at concrete examples.

Examples of Revisions

  • Changing the wording of the text
  • Swapping a photo for a different one (same number of photos)
  • Making a color a little darker or lighter
  • Fixing typos
  • Changing the wording of a heading

These are adjustments that improve what was already going to be built. They are included in the quote.

Examples of Spec Changes

  • Adding pages (planned 5 pages → 7 pages)
  • Significantly increasing the fields in the contact form
  • Using a different layout only on smartphones
  • Adding a booking feature
  • Deciding you now want photos taken for you

These involve a change in the amount or type of what is being built. They require an additional quote.

Gray Areas

In practice, cases in between are the most common, and this is where disputes arise.

  • “I want to rearrange the structure of the homepage” — If it’s only the order, it’s a revision; if it involves adding or removing sections, it’s a spec change
  • “I want to change the design direction” — This means redoing a design that has already been submitted, so it is usually a spec change
  • “I want to change the reference site” — Same as above

If you’re unsure, ask yourself “Does this require rebuilding something?” Roughly speaking, tweaking something is a revision, and rebuilding it is a spec change.


The Same Change Costs More the Further Along the Process

This is unavoidable given how web production works.

StageIf asked to “add one page”
Planning stageJust add one line to the plan. Almost no impact
Design stageAdd one more design. Moderate
Development stageDesign + development + testing. A substantial amount of work
Right before launchAll of the above + rechecking everything. The heaviest

It’s like building a house: adding a room at the blueprint stage and adding one after the walls are up are both “one room,” but what it takes is very different.

So please tell us early even if it’s “not settled yet, but we’ll probably change it.” If you wait until it’s decided, work continues in the meantime. From the production side, if we know something isn’t decided, we can leave that part for later and keep moving.


How to Communicate Changes Without Disputes

① Put It in Writing, Not Just Verbally

If you only mention something verbally in a meeting, each side’s memory will differ. Please send it in a form you can refer back to later, such as email or chat. The same goes for the production side: they should reply in writing, for example, “Understood. This will cost an additional ¥X, and the deadline will move back by X days.”

② It’s Fine to Ask “Will This Cost Extra?”

Many people feel awkward asking, but the production side actually appreciates being asked. Starting work while things are unclear and only bringing it up at the billing stage is far more awkward.

When it seems the answer could go either way, confirming before work begins is the safest approach for both sides.

③ Check the Impact on the Deadline at the Same Time

People tend to focus only on additional costs, but the deadline will also shift. If your situation is “additional cost is fine, but the launch date can’t move,” please tell us that at the same time. Paying more does not necessarily shorten the deadline (because adding more people doesn’t necessarily mean the work can be done in parallel).


What to Check in the Quote and Contract

Checking these before you place the order will save you trouble later.

  • Number of revisions — Does it say “up to X rounds”? If it doesn’t, confirm verbally
  • What’s included — Number of pages, features, supported browsers and devices
  • What’s not included — A quote that states this clearly is trustworthy. Photography, copywriting, and logo creation are items that are often not included
  • Procedure when a spec change occurs — Is there a clause such as “requests are made in writing, and work begins after the additional cost and deadline are presented and agreed upon”?

The “what’s not included” section is especially important. A quote that leaves it out may look cheap, but additional costs can pile up later.

For how to read quotes in general, see How to Read a Website Production Quote.


The Production Side’s Honest View

To be honest, we don’t mind changes themselves. Seeing the actual screens and realizing “this isn’t quite right” is also a sign that you’re thinking seriously about your site.

What causes trouble is not the changes themselves, but situations like these:

  • A large batch of changes arrives right before completion — If we’d been told earlier, we could have built them into the schedule
  • Changes come with the assumption that they’ll be free — We can’t have a conversation about the amount of work
  • They contradict earlier instructions — It’s unclear which is the latest, leading to back-and-forth to confirm

On the other hand, if you send changes early with a quick note like “Will this cost extra?”, most changes go smoothly.


Summary

  • Revisions and spec changes are different. The dividing line is “within or beyond the agreed scope”
  • If unsure, ask yourself “Does this require rebuilding something?”
  • The same change gets heavier the further along the process. Tell us early, even while you’re still deciding
  • Put it in writing. Confirm both the cost and the deadline together
  • Before ordering, check the number of revisions, what’s included, what’s not included, and the procedure for changes

It’s rare for a production project to go all the way to the end exactly as first decided. Assuming changes will happen and deciding how to handle them at the start is what ultimately makes things fastest and cheapest.

For how the overall production process works, see The Website Production Process, and for what to prepare before ordering, see Website Production Preparation Checklist.