Trouble in website projects tends to start in the same places. It isn’t about how much the project costs. It depends on which part of the contract was left unwritten.
When a dispute does happen, verbal promises from meetings don’t help much. What counts is what the contract and its appendix say. Put another way, if you spend 30 minutes checking 7 places when you sign, the last few weeks of the project will go more smoothly.
In this article, we list 7 places in the order that, from our experience as a web developer, they most often cause disputes. For each one, we explain what to check and how. It’s written for the client who is placing the order.
The most important thing isn’t the price or the deadline. It’s the “scope appendix.” Check whether the appendix describing the project scope lists both “what is included” and “what is not included.” A contract that leaves this blank will lead to a dispute later. A list of what is not included isn’t unfriendly. Think of it as proof that both sides have the same understanding.
① The Scope Appendix — Does It List “What Is Not Included”?
The main text of a contract looks much the same from company to company. The real differences are in the appendix.
| What the appendix should cover | Example |
|---|---|
| Number of pages and breakdown | Home, Company Profile, Services (3 pages), Contact = 6 pages total |
| Features | One contact form, embedded Google Map |
| Items supplied by the client | Photos, logo, and copy supplied by the client |
| What is not included | Photography, logo design, copywriting, multilingual support, e-commerce features, updates after launch |
If the “not included” field is empty, or if there is no scope appendix at all, the scope has no limit.
From the developer’s side, this isn’t about being difficult. Without a fixed scope, a developer can’t make an estimate, so they have to price the work on unspoken assumptions. When those assumptions turn out to differ from yours, that’s when disputes start.
If you’re told there is no scope appendix, it still helps to send the meeting notes by email and keep a record that both sides agreed. Send a bulleted list such as “Based on today’s discussion, we understand the project scope to be as follows,” and get a reply. This will matter later.
② Copyright and Ownership — Can You Freely Work on the Site After Delivery?
“Will the delivered website be mine?” The answer depends on how the clause is written.
There are two things to look at.
- Transfer of copyright — Does it say something like “Copyright shall transfer to Party A upon delivery”? (It’s common to add a condition such as “after full payment.”)
- Third-party rights — How are parts that don’t belong to the developer, such as themes, plugins, and stock photos, handled?
Realistically, the rights to paid themes and stock photos are not transferred to you. What matters is knowing which parts aren’t transferred and what you need in order to keep using them. If the theme license stays in the developer’s name, you won’t be able to renew it after the contract ends.
The same applies to who your domain and server are registered to. We cover this in detail in Why You Should Own Your Domain and Server in Your Company’s Name.
③ Number of Revisions — “How Many” and “When Counting Starts”
Even when a contract says “up to 2 revisions,” it often doesn’t say what counts as one revision.

Check these three points.
| Point to check | Common misunderstanding |
|---|---|
| What counts as one revision | If feedback is sent in small pieces without first being gathered internally, each piece may count as a separate revision |
| The stage where counting starts | From the design proposal, or after the site is built? |
| What happens if you exceed the limit | A set fee per revision, or an hourly rate? |
The practical tip is to gather all internal feedback into one message before sending it. If three people each contact the developer separately, that’s three revisions. If you send it all together, it’s one.
We explain the difference between revisions and specification changes in What Happens When You Say “Actually, I Want It This Way” Partway Through a Project.
④ Acceptance and Payment — “When Is the Work Considered Complete?”
Payment terms usually say “within X days after acceptance is complete.” So when is acceptance complete?
- The acceptance period (for example, “acceptance within 7 business days of delivery”)
- What happens if no response is given within that period (Is there a “deemed acceptance” clause, meaning the work is automatically considered accepted?)
- The acceptance criteria (usually, that the work meets what is described in the scope appendix)
The deemed acceptance clause itself is necessary so the developer’s work doesn’t stall. The problem is when the client lets that period pass without knowing about it. Always put the acceptance period in your calendar.
On the other hand, something to be careful about as the client is not dragging out acceptance. If you keep putting it off with “we’d like to review it a bit more internally,” the developer can’t move on to their next project, and they become less able to take on additional requests from you.
⑤ Procedure for Specification Changes — Is There a Process for Requesting Changes in Writing?
It’s normal for requirements to change during a project. The problem is when there’s no agreed way to handle those changes.
A good contract describes a process like “request the change in writing → estimate the additional cost and the effect on the schedule → start work only after agreement.” With this clause in place, changes don’t lead to disputes.
Even when the clause exists, it sometimes goes unused, and changes keep piling up as “free extras.” That may seem nice at first, but it becomes unclear what is free and what isn’t, and eventually you’ll hear, “We can’t do any more than this.” Even for small changes, it’s healthier for both sides to ask each time, “Will this cost extra?”
⑥ Delivery Delays — Are They Handled Differently Depending on the Cause?
Delays aren’t always caused by the developer.
| Cause | Typical handling |
|---|---|
| Delays in the developer’s work | The developer’s responsibility. A clause on damages for delay may apply |
| Late delivery of client-supplied materials (photos, copy) | The deadline moves back (the client’s responsibility) |
| Delays in reviews and approvals | Same as above |
| Specification changes | The deadline is reset when the change is agreed |
The most common causes in practice are late materials and late approvals. Check whether the contract says something like “delays caused by the client will be added to the delivery deadline.” If it doesn’t, it becomes unclear who is responsible for delays.
As the client, the most effective step is to put the dates for delivering your materials in your calendar as your own deadlines. We list what to prepare in What to Prepare Before Building a Website.
⑦ Termination and Handover — What Happens If You Stop Partway Through?
Finally, this is the clause people check least, even though it’s the most important.
- If the contract is terminated partway through, how is payment settled for the work done up to that point?
- Will work-in-progress data be handed over?
- If you cancel the maintenance contract after launch, how will the server, domain, and admin access be returned to you?
The third point is hard to picture when you sign, but it will matter a few years later. It decides whether you can switch providers when you want to. If you’re already facing this problem, see Changing Your Website Developer for the steps.
What to Do If There Is No Contract
Small projects sometimes go ahead with only a purchase order and a quote, with no contract. Even then, if you keep a record of the following three things by email, they are generally respected in practice.
List “what is included” and “what is not included” by page and feature. The notes field of the quote is fine.
Send a bulleted list such as “We understand today’s discussion as follows,” and get a reply. This becomes your record of the agreement.
“Will this change cost extra? If so, please let us know the amount and the effect on the schedule.” Simply making a habit of sending this one line greatly reduces trouble in the later stages.
Both sides really do forget verbal agreements.
Frequently Asked Questions
- Is the developer the one who prepares the contract?
-
Generally, yes. The developer prepares it. If you have concerns about what it says, you’re free to request changes. In particular, it’s perfectly fine to ask them to add items to the “not included” list in the scope appendix.
- Is a revenue stamp required?
-
If the agreement counts as a contract for work (請負契約), a revenue stamp (収入印紙) is required, with the amount depending on the contract amount. If you sign electronically (for example, with CloudSign), no stamp is required. We use electronic contracts as our standard practice.
- What problems will I have if the copyright isn’t transferred to me?
-
You may face restrictions when you ask another company to modify the site. In practice, however, a common arrangement is “no transfer, but you are free to use and modify it as your own company’s website,” and in almost all cases that is enough. Rather than asking whether the copyright will be transferred, it’s more practical to ask directly, “Can I have another company modify the site?”
- I’m about to go over the revision limit. What should I do?
-
Talk to the developer before you go over. In many cases, depending on what the changes are, they may handle them without counting them as a revision. If you send a large batch after you’ve already exceeded the limit, that’s the first time extra costs come up, and it also leaves a bad impression.
Summary
Disputes in website development contracts happen in almost the same places every time.
- The scope appendix — Does it list “what is not included”?
- Copyright and ownership — Can you have another company modify the site after delivery?
- Number of revisions — What counts as one revision, and the stage where counting starts
- Acceptance and payment — The acceptance period and deemed acceptance
- Specification changes — Is there a process for requesting changes in writing?
- Delivery delays — How delays in client-supplied materials are handled
- Termination and handover — Termination partway through, and how access is returned when maintenance ends
Even without a contract, a scope appendix attached to the quote and confirmation by email can serve instead. If there’s anything unclear in a contract you’ve been given, send us just the relevant clauses without redacting them, and we’ll explain what they mean from the developer’s point of view. Please reach out through our contact form.